Skip to main content

Cost Estimation Methods in Infra Construction (5 cr)

Code: T300DI11-3005

General information


Enrolment period
02.07.2024 - 15.09.2024
Registration for the implementation has ended.
Timing
05.09.2024 - 05.12.2024
Implementation has ended.
Credits
5 cr
Mode of delivery
Contact learning
Unit
Construction Engineering
Campus
TAMK Main Campus
Teaching languages
Finnish
Degree programmes
Degree Programme in Construction Engineering
Teachers
Anne Hämäläinen
Johanna Plihtari-Siltanen
Person in charge
Hannu Kauranen
Tags
CONTACT
Course
T300DI11

Objectives (course unit)

The student is able to select an up-to-date quantity measurement instruction used in infrastructure construction and is able to read and apply it when making quantitative calculations. The student is able to make a cost estimate based on a completed quantity list when using any software in the field. The student is able to make a resource based cost estimate and can calculate a cost estimate for different work stages based on capacity and price data. The student knows the most important content of YSE. The student is able to explain the contract forms and their main differences. The student is able to list the types of risks involved in projects. After completing the course, the student will be prepared for cost accounting tasks related to the finance of a construction project in a construction and construction organization, as well as an understanding of how costs are incurred during the various stages of the project.

Content (course unit)

Cost management at different stages of the project. Costing methods at different stages of a construction project. Infra building component and project nomenclatures and volume measurement instructions. Calculation of quantities and sizing of equipment. Costing. Preparation of quotation, unit prices and installment table. The contract formats. Risks (at conceptual level). Cost monitoring during production.

Prerequisites (course unit)

Rakentamistalouden perusteet (TAL1), Maarakennustekniikka (GEO4)

Assessment criteria, satisfactory (1-2) (course unit)

- Can read quantity measurement instructions used in infrastructure construction and calculate the number of work steps used in infrastructure construction.
- Can make a cost estimate with the help of a completed quantity list and the given unit prices.
- Knows how to calculate cost estimates on a resource basis.
- Can list the main forms of contract and some risks related to infrastructure construction.

Assessment criteria, good (3-4) (course unit)

- Is able to calculate the number of key steps used in infrastructure construction using the quantity measurement procedure used in infrastructure construction.
- Can make a cost estimate with a completed quantity list and given unit prices, and can categorize non-site costs at unit prices.
- Is able to calculate cost estimates based on resource-based input data and capacities for key infrastructure work phases.
- Can determine what are the pros and cons of different types of contract in different cases.
- Can identify the main risks of a simple infrastructure construction project.

Assessment criteria, excellent (5) (course unit)

- Ed. in addition, the student has a comprehensive understanding of the course topics and their use in problem solving as well as the ability to present, analyze and reason logically solutions.

Location and time

lukujärjestyksen mukaisesti

Exam schedules

Mahdollinen kurssin arvosanan korottaminen tapahtuu tentin avulla.

Assessment methods and criteria

Opintojakso arvioidaan asteikolla 0-5. Arvosana arvioidaan annetussa aikataulussa palautettujen harjoitustöiden perusteella. Harjoitustöiden painotus seuraavasti: Harjoitus 1 - 40 %, Harjoitus 2 - 20 %, Harjoitus 3 - 40 %. Myöhästyneet palautukset vaikuttavat arvosanaan alentavasti. Mikäli on haluja korottaa harjoitustöiden perusteella saatavaa arvosanaa, onnistuu se aivan kurssin lopussa olevalla vapaaehtoisella kokeella. Opintojakson suorittamisessa edellytetään säännöllistä osallistumista (minimisuositus 70 %) harjoitus- ja oppitunneille.

Assessment scale

0-5

Teaching methods

lähiopetus
opetuskeskustelu
harjoitukset
harjoitustyöt
tentti

Learning materials

Tunneilla nimetty aineisto.
INFRAn Rakennusosa- ja hankenimikkeistö 2015 Määrämittausohje soveltuvine osineen.

Student workload

Lähiopetus yhteensä noin 40 h. Näillä tunneilla paitsi käydään teoriaa läpi, tehdään myös pakollisia harjoitustöitä (3 kpl) eteenpäin. Harjoitustöitä jatketaan omalla ajalla.
Lisäksi normaali itsenäinen työskentely.

Content scheduling

1. Johdanto, kustannushallinta projektin eri vaiheissa
2. Infran rakennusosa- ja hankenimikkeistöt sekä määrämittaus
3. Kustannuslaskennan menetelmät rakennushankkeen eri vaiheissa
4. Määrien laskeminen ja kaluston mitoittaminen
5. Kustannusarvion laatiminen
6. Tarjouksen, yksikköhintojen ja maksuerätaulukon laatiminen
7. Kustannusseuranta

Completion alternatives

ei ole

Practical training and working life cooperation

vierailevia luennoitsijoita

International connections

-

Further information

johanna.plihtari-siltanen@tuni.fi, anne.hamalainen@tuni.fi

Go back to top of page