Skip to main content

Control Systems in no-residential BuildingsLaajuus (4 cr)

Course unit code: 5T00BJ76

General information


Credits
4 cr

Objectives

The student is able to
- select needed sensors and control devices
- check the correctness of the Kv value and reason the calculation need
- design and place the necessary equipment and meters
- optimize solutions based on functional and economic criteria
- select systems based on sound reasoning

Content

P, I, D, PI and PID adjustments. Defining Kv value by calculation. Equipment suppliers’ sites. The structure and criteria of construction automation. Interfaces. Design project.

Prerequisites

Building Automation and HVAC (5T00BE18)

Go back to top of page